Kraków, Madalińskiego 9
Accessible
Avaliable space
854
Completion Date
2003
Number of Floors
4 piętra
Building Material
Cegła
Window Joinery
Drewniane
About the Location
The building draws attention with its balanced architecture — elegant yet understated — perfectly blending into the character of historic Dębniki, a district now experiencing a revival.
10-minute walk to Wawel Castle
Parking Spots
Reception in the Building
Server room
CCTV Monitoring
Access Control
Air Conditioning
Conference Rooms
Elevator
Bicycle Parking
Cyclist Facilities
Partially Furnished
Storage Space
Lots of Greenery, Garden, Close to the Vistula River
Apartments, Shops, and a Pharmacy Nearby
Spacious Corridors
Bright spaces
Epol Holding Representative in Kraków